Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope covered the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://rotatesites.com/story22132464/penmann-finalises-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2